Al-Azhar Hospital Building

post-featured-image
Project: Al-Azhar Hospital building consisting of 7 floors with a total area of ​​4250 in Nasiriyah Iraq, it was implemented within 80 days The project included the manufacture of the iron frame with European specifications and its dye with an anti-rust basis, with the preparation of the cast iron corrugated sheet and its own nails and transporting the product from the factory to the site. Project date 1/12/2018